Scope of Works:
Project: New Facilities HVAC Installation – Paracombe Primary School
Delivered a full mechanical fit-out for newly constructed facilities at Paracombe Primary School, providing modern, efficient climate control throughout the space.
Key Works Delivered:
-
VRV System Installation
Installed a complete VRV system, including 7 indoor fan coil units to provide flexible zoning and energy-efficient temperature control. -
Sheet Metal Ductwork & TEF Installation
Supplied and installed all required sheet metal ductwork and Terminal Exhaust Fans (TEF) to support ventilation and air distribution throughout the new building. -
Third-Party Controls Integration
Successfully integrated third-party building management controls to ensure seamless operation and long-term serviceability of the system.
All work was completed in alignment with education facility standards, manufacturer requirements, and current mechanical codes.